Osiris - rex asteroid sample return mission. 1.1 osiris - rex deputy principal investigator, heather enos, osiris - rex business manager, dr. Drake and dr. Lauretta will have the overall responsibility for the development and delivery of the osiris - rex phase a concept study report. The concept study report must meet the requirements delineated in part II of the statement of work. 1.2 the concept study report (CSR) will include, but not limited to, proposed level 1 science requirements, criteria for full mission success satisfying the baseline science mission and criteria for minimum mission success satisfying the threshold science mission. 1.3 the ua management team will work closely with the gsfc and lm management teams to refine the proposed osiris - rex mission costs. The ua management team will work closely with gsfc project management and lm to assess the robustness and feasibility of the cost and schedules. The ua management team will have the lead for the cost section of the report. 1.4 the ua management team will provide support in the development of required international agreements such as technical assistance agreements and itar licenses. 1.5 the ua management team will oversee the phase a contract with instrument lead, dr. Phil christensen, asu. 1.6 the ua management team will provide inputs and validation support to the gsfc integrated master scheduler. 1.7 deputy pi, dr. Lauretta, will lead the development of the e/po and student collaboration plans. 1.8 the university of arizona (UA) will support the osiris-rex site visit at lockheed martin, littleton, co.

University of Arizona (part of Arizona Board of Regents)

National Aeronautics and Space Administration › National Aeronautics and Space Administration › NASA Marshall Space Flight Center

Signed Mar 16, 2010 · Definitive contract · NNM10AA11C

Standalone

Value

Obligated

$137.4M

Current

$140.8M

Ceiling

$140.8M

98% of the ceiling is funded. Exact: $137,415,815 obligated of $140,816,554 ceiling. The ceiling is the most this award can grow to, not money won.

Period of performance

Today

Start

Mar 16, 2010

Current end

Sep 30, 2029

With all options

Sep 30, 2029

Details

NAICS
541712 · RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
PSC
AR13 · Space R&d Services; Space Flight, Research and Supporting Activities; Experimental Development
Award type
Definitive contract
Pricing
Cost No Fee
Competition
Full and open
Offers received
999
Set-aside
None
Solicitation procedures
Negotiated Proposal/quote
Place of performance
Tucson, AZ
Awarding office
NASA Marshall Space Flight Center
Subawards reported
7

Description

Osiris - rex asteroid sample return mission. 1.1 osiris - rex deputy principal investigator, heather enos, osiris - rex business manager, dr. Drake and dr. Lauretta will have the overall responsibility for the development and delivery of the osiris - rex phase a concept study report. The concept study report must meet the requirements delineated in part II of the statement of work. 1.2 the concept study report (CSR) will include, but not limited to, proposed level 1 science requirements, criteria for full mission success satisfying the baseline science mission and criteria for minimum mission success satisfying the threshold science mission. 1.3 the ua management team will work closely with the gsfc and lm management teams to refine the proposed osiris - rex mission costs. The ua management team will work closely with gsfc project management and lm to assess the robustness and feasibility of the cost and schedules. The ua management team will have the lead for the cost section of the report. 1.4 the ua management team will provide support in the development of required international agreements such as technical assistance agreements and itar licenses. 1.5 the ua management team will oversee the phase a contract with instrument lead, dr. Phil christensen, asu. 1.6 the ua management team will provide inputs and validation support to the gsfc integrated master scheduler. 1.7 deputy pi, dr. Lauretta, will lead the development of the e/po and student collaboration plans. 1.8 the university of arizona (UA) will support the osiris-rex site visit at lockheed martin, littleton, co.

As entered by the contracting office; shown in sentence case.

More from University of Arizona

No other new awards from this vendor yet.

Other orders on this vehicle

Standalone contract.